• TTE® - for riding arena and exercise area/paddock

    • build WITHOUT A SUBSTRUCTURE
    • TTE® is a separating layer and a base course layer
    • guarantees dewatering due to the ON TOP construction
    • ideal as a self-build
equestrian sport & keeping of animals

Yard / Exercise areas and cattle paths WITHOUT A SUBSTRUCTURE

TTE® is ToTally Simple (ToTal Einfach in German)

  • it functions WITHOUT a substructure due to the high own load-bearing capacity of the elements
  • is laid directly on the building ground (an ON TOP construction, no excavation of the ground)
  • is a separating and base course layer in one system
  • can be laid oneself QUICKLY and SIMPLY
  • for exercise areas / paddocks
  • guarantees dewatering due to the ON TOP construction and high number of joints
  • always remains flat due to the 4-part interlocking system
  • is long-lasting and retains its value, can be removed damage-free and can be used again
  • is impact dampening => easy on the joints due to the movable interlocking of the individual elements
TTE®-MultiDrain PLUS 3000

TTE®-MultiDrainPLUS 3000
800 x 400 x 60 mm, ca. 8.6 kg (ca. 27 kg/m2)
Web thickness: 14 / 15 mm

WHAT is TTE®?
A separating and base course layer in one system

TTE® elements are significantly more stable and heavier than other riding arena grids, paddock mats or turf grid plates. Due to a high own load-bearing capacity and the intelligent load distribution, up to 100% of the base course layer material can be saved on and the TTE® construction principle can be laid directly onto the building ground.

TTE® Separates Supports Dewaters

  • TTE® replaces the base course layer; the components simply need a levelling course of about 5 cm, the chamber filling and maybe the covering layer
  • Therefore with TTE® you save significant costs for the material and building time/costs
  • Due to the ON TOP construction water can seep away permanently and the surface is usable all year round

HOW does TTE® work?
Build WITHOUT A SUBSTRUCTURE due to the load distribution

Due to the high own load-bearing capacity and the 4-sided interlocking system of the TTE® elements loading at a point from the hoof is distributed over a wider area. Therefore TTE® replaces the base course layer. The exercise area reinforcement are neither sealed nor compacted. There is no need for cost-intensive material and building works (one dispenses with excavation of the ground, procurement of base course layer material and installation).

HOW does TTE® work?

YOU CAN COMPLETELY FORGET: hard, dense surfaces, mud and uneven parts

NO MORE MUD

  • no sealing/compaction of the surface
  • water permeable over the long-term
  • supported by forced mechanism joints
    => build-up of mud is impossible

permanently FLAT

  • a 4-part interlocking system and wide contact surface
    => permanently flat

easy on the joints

  • installation directly onto natural soil => hard on soft
  • reduced wear on the joints and the structure
  • increased impact dampening due to the elastic layer
    => the forest floor effect

ecological & low odour

  • the retained top soil (microorganisms) filters out and decomposes pollutants
  • low odour and hygienic surfaces
  • no intervention in the ground => makes it far easier to go through the building approval process

Summary

The TTE® construction principle provides for appropriate animal husbandry and is sustainable for the environment

WHERE is the TTE® construction principle used?

Select the area you are interested in by clicking on the respective picture

Yard / Exercise area

TTE®-yard

Cattle paths

TTE® cattle paths